Tusen · StavangerFrom code to atoms.It's all in the details.
FACTORY ▸
From code to atoms.It's all in the details.
Tusen
Mechanics, controls, software and electrics for industrial machines, and the power systems they connect to.
Tusen AS coordinates the project and designs the mechanics, software and controls, electronics and electrical power of industrial machines and containerised units. For the power systems they connect to, it delivers studies and specifications: grid coordination, protection and selectivity, short circuit, arc flash and reliability. The manufacturer named in each contract builds the machine; Tusen licenses its software and design per project.
Code runs on electronics, electronics drive motors, motors move steel, and the law decides whether the machine may be sold. Projects stall at the handovers between specialists. Tusen coordinates the project and designs the mechanics, software and controls, electronics and electrical power, and the software factory keeps one record across all seven, so nothing is lost between Tusen and the engineers who own the rest.
From one circuit board to the mechanics and controls of a complete machine, and the power system it connects to. Tusen designs; the manufacturer named in each contract builds the machine, puts its name on it and holds the technical file. Software is the one thing Tusen builds itself.
01What you can hire Tusen for
Project coordination
One record for the whole design: scope, decisions, drawings, and the interfaces between disciplines, such as the mounting points, loads, cable routes and cabinet space agreed between the mechanical and electrical design. The manufacturer named in the contract approves the design.
Mechanical design
Machines and structures designed the way a workshop builds them: 3D CAD, weldments and folded sheet, drawings, cut lists and priced parts lists, with every moving part checked over its full travel. The FT-650 lift table under Models is one.
Software and control design design · build
Control systems for machines, with motion, I/O and safety functions, and the software that runs them. Also industrial software, data platforms, integrations and internal tools. Tested, reviewed and documented.
Electronics design
Circuit boards, sensor interfaces and embedded controllers with their firmware, from schematic to the files a board maker needs.
Electrical (power) design
The electrics of machines and containerised units: power distribution, motor drives and power electronics, motors and actuators sized by calculation, and the electrical drawings for the machine's own cabinet.
Power systems and protection studies
For plants, containerised units, shore power and large loads, delivered as studies and specifications: load flow, short circuit and arc flash, earthing, cable sizing, switchgear and MV transformer specification, protection selection, coordination and selectivity, grid coordination and reliability assessment. Your registered electrical contractor designs and signs the installation. Grid coordination →
Legal research
The rules a design must meet: the machinery regulation, CE marking and the technical file, standards, permits and data licences, each cited to its source.
Jakub Jędrzejczak, Tusen's engineer, is a specialist in power system automation and protective relaying, with research and product work behind the studies Tusen offers. The work below was done at ABB, at Eaton and, from 2023 to 2026, at a company in Norway, not at Tusen.
ABB CORPORATE RESEARCH, KRAKÓW · 2015–2019Protection and control relaysPower system automation and protective relaying, including the Petersen coil control application and line differential protection for ABB's REX640 relay and SSC600 centralised protection and control.
EATON RESEARCH LABS, PRAGUE · 2019–2022LVDC and aircraft powerLVDC microgrids, and the power distribution unit for the VX4 electric aircraft of Vertical Aerospace. Its Valo is a later iteration of that initial concept.
SHORE POWER IN NORWAY · 2023–2026The equipment for a multi-megawatt shore power plantDesigned and procured the neutral earthing resistor and all the equipment for a multi-megawatt shore power plant.
SHORE POWER IN NORWAY · 2023–2026Studies, design and tendersEarthing in the building and at the quay, cable calculations, short circuit, arc flash and load flow, switchgear and MV transformer design, protection selection, coordination and selectivity, compliance with standards and regulations, and tender support; help for other teams with LV containerised solutions; and built an in-house study tool on par with ETAP.
What Tusen does not offer. Building hardware, selling whole machines, installation, and designing the network operator's side of grid or quay connections. Electrical installations in buildings, plants and ports, and work on the supply grid: Tusen AS is not registered in DSB's register of electrical contractors. Machine electrics and shore power equipment are designed as products; the manufacturer builds them, and installing and connecting them is done by your registered electrical contractor. Power system work (earthing, cable sizing, switchgear and protection) is delivered as studies and specifications; the installation is designed and signed by your registered electrical contractor. Tusen AS is not a law firm: its legal work is regulatory research for engineering projects.
How Tusen works with machine builders
Tusen coordinates the design and does the mechanical, software and control, electronics and electrical power design, and the power system studies.
The manufacturer named in the contract builds the machine, puts its name on it and holds the technical file.
Tusen's software and design are licensed per project, never transferred.
Support and updates by agreement.
Source code and design files can be deposited in escrow, so your records do not depend on a one-person company.
Two ways to hire Tusen
Project coordination, mechanical, software and control, electronics and electrical (power) design for your machines, as a subcontractor to the machine builder, and power system studies for your plant, site or connection.
Software from the factory: web apps, data platforms, internal tools and controls software, drafted and tested by agents and signed by an engineer. ClusterAlpha, below, is built this way.
Priced per engagement: a design fee, a licence, and an optional support agreement.
A design for an automated washer for precast concrete wall elements up to 4 by 10 metres. A mast runs on a floor rail, the spray head steps in and out from the face, and the controller reads each element's openings from a file and skips the windows.
Mechanical: rail, mast and carriage by the project's mechanical engineer, checked by calculation and FEA
Electrical: cabinet, drives and safety circuit, in twelve drawings
Software: a tested path planner that writes the machine's G-code
Safety: designed to EN ISO 12100, EN ISO 13849-1 and EN 60204-1
The design is with the client for decision. Nothing has been built yet.
Sector · steel and surface treatment
Blasting and painting, by the drawing.
Much of the blasting, painting and washing of large steel parts is still done by hand. Tusen designs the controls and software for cells that read each part from its drawing and move the gun or nozzle along it, the same pattern as the concrete washer.
Beams, tanks, frames and other large parts
Paths generated from the part's drawing
Designed for the manufacturer's CE route under the Machinery Regulation
Sector · timber elements and windows
Wall elements, nailed from the CAD file.
Timber wall and roof elements, modular houses and windows still take a lot of hand work. Tusen designs the controls and software for nailing and stapling bridges, drilling and marking stations, and inspection, all driven by the element's CAD file.
Openings and studs read from the drawing
Nailing, stapling, drilling and marking
Built and signed by the manufacturer named in the contract
Sector · machine and equipment makers
Electronics and test rigs for the machines you sell.
Makers of pumps, hydraulics, lifting gear and farm machinery need control boards, firmware and end-of-line test stations. Tusen designs them; the design is licensed to you, and its files can be deposited in escrow.
Control electronics and firmware for your product
Test stations that check each unit and write the report
Controls, software and electronics as a subcontractor
Sector · shipyards and repair
Hull work from a mast, not a lift.
Yards wash, blast and paint hulls and large parts from lifts and scaffolding. Tusen designs the controls and software for rail- and mast-mounted tools for that work, built by the yard or a machine builder.
Washing, blasting and painting of hulls and parts
Paths planned from the hull's shape
Controls and software subcontracting
Sector · containerised units
Power and equipment, in a container.
Some equipment is best built, tested and moved as one finished unit. Tusen designs the electrics, controls and monitoring of containerised modules: shore power for ships at berth, battery and power-conversion containers, local equipment rooms, and test containers.
Shore power with frequency conversion for 50 Hz and 60 Hz ships
Battery and power-conversion containers
Local equipment rooms (LER) and test containers
Control, protection and monitoring electronics
Power system studies for the shore connection: load flow, short circuit, arc flash, earthing and protection coordination, delivered as studies and specifications
Built and delivered as finished units by the manufacturer named in the contract
Installation on the quay or site and the connection to the grid are done by a registered electrical contractor.
Sector · ferries
Charging at the quay.
Public ferry contracts have required zero emission since January 2025, so every electric ferry needs power at the quay. Tusen designs the controls and electronics of automatic plug-in arms and battery containers, and the charging control that hands power to the ship.
Automatic plug-in arms
Battery containers that buffer a weak grid
Charging control and monitoring
Installation on site and the connection to the grid are done by a registered electrical contractor.
Sector · aquaculture
Feed barges off diesel.
Fish farms are moving feed barges from diesel generators to shore cable and batteries. Tusen designs the electrics and controls of battery and power-conversion containers, and the energy-management electronics that run a barge on them.
Battery and power-conversion containers
Generator, battery and shore-cable control
Remote monitoring of the barge's power
Installation on site and the connection to the grid are done by a registered electrical contractor.
Sector · construction
Site power in a container.
Oslo has required emission-free machines on its own building projects since 2025, and electric cranes and diggers need power where the grid connection is too small or not there yet. Tusen designs the electrics and controls of battery and site-power containers, and the electronics that share power between the machines.
Battery and power-distribution containers
Load sharing between cranes, diggers and chargers
Moved from site to site as one unit
Installation on site and the connection to the grid are done by a registered electrical contractor.
Software · from the factory
Software Tusen builds.
Software is the one thing Tusen builds itself. Each tool below is built by the software factory for the client's own process, tested before review, signed by an engineer, and licensed per project.
01
Service records HVAC · refrigeration
For service contractors who look after many sites: units, service agreements, leak checks and refrigerant records in one place, so the next visit starts from the last one.
02
Scan to drawing modification projects
From a laser scan or a survey of what is already there to fabrication drawings that are generated, not drawn by hand.
03
Completion paperwork fabricators
Welding procedures and qualifications, inspection and test records, assembled into the handover dossier, with the same paper trail as every Tusen delivery.
For organisations with existing systems and many people who must agree. Each decision goes to the person who owns it, in words they can judge, before code changes. The change is then surgical: complete, but no larger than it must be, agreed in size before work starts, reversible, and signed by a named engineer.
01 · DECIDE
SAD open method
Stakeholder-Anchored Development. Every feature is explained three ways: in plain language for the domain expert, as a plan for the architect, as code for the engineer. Each approves what it can judge, and a rejection goes back to the step it concerns.
02 · CHANGE
Surgical changes existing code
Your code is your team's property, not raw material. Each change gets a risk tier and a budget of files, lines, new dependencies and public interfaces, agreed before work starts. Problems found beside the change are reported, not fixed in passing, and every change has a rollback plan.
03 · GUARD
Archangel in development
A safety net under AI-assisted work. It pauses force-pushes and history rewrites, whoever typed them, and offers the safer alternative first. The record stays on your own disk.
ScopeYou approve the goal, what counts as done, what is out of scope, the risk tier and the budget.
PlanFor high-risk work you approve the plan before code is written, and changes to existing functions one by one.
WalkthroughBusiness, architecture and engineering each sign their own account of the feature.
OverrunIf a change would outgrow its budget, work stops and you choose: split it, trim it or raise the budget.
HandoverYour team reviews the package and decides what is merged.
02What you receive
For the people who decide
An intent for each change: goal, success criteria, risk tier, budget and rollback.
Walkthroughs in three registers: plain language, plan and code.
A review package whose first part a manager can read without code.
For the people who maintain it
Commits that cite the decision they carry out; a change that maps to no approved decision is flagged.
Tests for each success criterion, and the results of the checks run on the changed lines.
The signature of the engineer who did the work.
SAD is an open method (MIT) published at sad.codes. Archangel is in development. Approvals are given by people and recorded in the project's documents; the tools support the steps, they do not replace the sign-off.
Each model is the working 3D view from Tusen's design work. Drag to turn it, scroll to zoom, run its motion. Twinmetry redraws the same live model with photoreal light and soft shadows, and every control keeps working.
The model loads when this part of the page comes into view.
Drag to turn, scroll or pinch to zoom, right-drag to pan. Raise and Lower run the scissor through its travel.
Twinmetry · Real3D scanning, facility models and an AI companion
Your site, scanned, measured and explained.
For operators of data centres, factories, plant rooms and workshops. Tusen scans a room with LiDAR and photos, turns your design model into one model you can walk on a laptop, in a headset or on an iPad, and is building an AI companion on top that finds the asset, shows the steps and cites your own documents.
LiDAR point cloud · a room captured in coloured pointsWalls, furniture and floor, each point in place
Real3D · a scanned room, measured in the browserDistance, height and area, taken on the LiDAR surface
01Real3D: scan a room, then measure it from your desk
01 · CAPTURE
Walk the room iPad Pro LiDAR
A technician walks the room with a LiDAR iPad Pro. The Twinmetry capture app records posed photos and depth: one bedroom took 428 photos and 1,994 depth frames.
02 · REBUILD
A photoreal room about 4 million points
The poses are refined, then the room is rebuilt as a photoreal 3D scene of about 4 million soft points, with a LiDAR surface underneath for measuring.
03 · MEASURE
In the browser no install
Orbit, walk or fly through the room. Ten measuring tools: distance, chain, angle, height, point, plane, point to plane, plane to plane, circle and area, exported as CSV or JSON.
Photo (left), Real3D render (right) · the photo was kept out of the buildAn earlier capture, same test · floor and rug hold, plain walls soften
02Your whole facility as one model you can walk, trust and act on
Built for a data-centre operator: the design model became a working digital facility, with every pump, CDU (coolant distribution unit), rack, busway and pipe named and clickable on a laptop, in VR and on an iPad. The aim: technicians find the right asset and plan changes faster, and the model stays true to what is installed.
The whole site · every part named and clickableIllustration
01Find any asset, even the untagged onesOne label per asset is both its ID and a positioning point for the iPad, so "take me to it" works among identical racks.
02An as-built record you can trustQuick iPad scans align to your model and mark every part verified, changed or not yet confirmed.
03Retrofits that fit the first timePlan new racks, CDUs or pipe tie-ins against the as-built, not the drawings: clashes and install paths before anyone is on site.
04Show it before it is builtWalk tenants and investors through the site in a headset or a browser. The same model and asset register become the handover standard for the next build.
03The AI companion, in development: ask your facility
In development: an AI companion inside the Twinmetry iPad app. Ask by voice or in text, in English or Norwegian; it answers in a natural voice, flies the 3D model to the asset, highlights it and names the page of your maintenance, service or outage document it used. It works on your design model, on iPad scans of your rooms, and on both together.
Ask in words, get the place · the answer cites its pageIllustrationX-ray by system · one CDU and the rows it feedsIllustration
01Ask in words, get the place"Take me to the CDU feeding row 3." It answers and moves and points in the model; before it says "this valve", the app checks the valve is on screen.
02Your documents become answersUpload maintenance, service and outage documents. Every answer cites the document and page, and past outages can be replayed step by step on the model.
03Find and isolate any objectIsolate a pump, a rack or a valve in the design model, and in iPad scans of a room, where the app picks the object out of the photos and the 3D scan.
04Design model and scan, togetherA room scan is aligned to the design model, so you see what was built differently, with the accuracy stated.
05Changes explained, step by stepDescribe a change, or upload a drawing or a photo: step cards, affected parts and a parts list, estimates marked as estimates.
After an outage
Show me what happened in the last outage, step by step.
Replays the outage report on the model in order, highlighting each affected unit.
Quotes the report at each step, with the page.
Answers follow-ups: "Which racks were on that CDU?"
Planned maintenance
Isolate the cooling circuit and walk me through the filter service on heat exchanger 2.
Hides everything else, flies to the filter and rings it.
Reads the steps from the service manual one at a time, with parts and tools.
Knows the maker and model of each unit from the design model.
Planning a change
Where can two more CDUs go, and what changes in the pipework?
Walks the change on the model: step cards, affected parts, clearances.
Works a sketch, a photo or a description into the model as a proposal you accept or discard.
Gives a parts list, estimates marked as estimates.
You askBy voice or text, standing in the room or at your desk.
It looks it upIn the design model (tags, makers, systems), your scans and your documents, on the iPad.
It checksEvery part it names exists and is on screen; every claim has a source. If it is not sure, it says so.
It answersSpoken and written, the model moved to the place, the part highlighted, the page cited.
In development: object recognition in scans. Each object found in a scan is tied to its place in the design model, so it gets the model's name, maker and system. Anything that does not match stays "unconfirmed" until a technician confirms it. The bar set before release: no wrong match, and a precision shown to be at least 97 % at 95 % confidence.
04Start with a pilot, on targets agreed first
A 12-week pilot on one plant room and one area of the floor, for a fixed fee. Proposed targets, agreed with you before anything is measured:
9 in 10test questions answered with the right asset on screen
−40 %time from work order to a hand on the right asset
≥ 95 %assets in the pilot zone with ID, label and photo
≤ 5 cmmodel-to-reality overlay near a marker
What you keep
You own everything created: scans, asset IDs, the document index.
Open exports at any time (IFC, COBie, BCF, glTF, CSV, PDF), so there is no lock-in.
Read-only: Twinmetry never controls live systems.
Where your data stays
For the companion: on the iPad by default, the model and documents stay on the device, and it works offline on the floor.
Cloud AI only with your written consent, through a processor you name.
Scans are processed on your premises or on Twinmetry's servers in AWS Stockholm (EU).
Running today: Real3D room scans with the browser viewer and its measuring tools; a whole facility model in the Twinmetry iPad app, offline, with every part named, and in VR. Planned for the pilot, not running today: asset labels for iPad positioning, the verified / changed status from iPad scans and retrofit planning on the as-built. In development: the AI companion, whose first version finds a part, shows it in the model and draws the route to it, so far tested off site; and object recognition. The pictures marked Illustration are generated for this page and show no real site; the room scans are Tusen's own captures. The pilot targets are proposals, not measured results.
Grid coordination · battery storage, UPS and compensation at large loads
Large loads the grid can live with.
For AI data centres, factories and other large electronic loads. Network operators now propose that a big load ride through grid faults, come back within about a second, ramp at a set rate and damp oscillations instead of amplifying them. That takes the battery energy storage system (BESS), the UPSs, the capacitor banks and the IT load working as one system, in a stated order. Tusen offers to design that coordination and to prove it by study and site test.
01The public record: what goes wrong
Network operators in three power systems have measured large losses of data-centre and computing load at ordinary, correctly cleared grid faults. The load was taken off on the customers' side, by UPS transfers and protection at data centres and by power supplies dropping out at crypto-mining sites, not by utility equipment.
≈1,500 MWdata-centre load lost after six cleared faults, PJM area (US), July 2024 · 1
≈3,800 MWload moved to backup at one 230 kV fault, PJM area, July 2026 (preliminary) · 2
26ride-through events losing more than 100 MW at crypto-mining sites, Texas, 2023–2025 · 4
14.7 Hzoscillation a utility measured and traced to a data centre's UPS input stage · 8
≈20 msUPS battery response measured in Statnett's 2018 pilot at two Norwegian data centres · 9
0published field measurements found of a battery smoothing AI load at an operating site; lab and simulation only · 10, 11
PJM AREA (US) · 2024 · MEASUREDCleared faults, hours of lost loadSix faults in 82 s, each cleared in 42–66 ms. A site scheme that counts disturbances met the line's auto-reclose sequence: about 1,260 MW left at the third dip and stayed away for hours. · 1
PJM AREA · 2026 · PRELIMINARYTransfers that feed each otherThe first transfer to backup raised the voltage and triggered more; capacitor banks tripped on over-voltage. The sequence has to be studied as one system. · 2
IRELAND · 2022–2025 · MEASUREDThe loss grows with the loadFour faults cut data-centre demand by 74, 204, 321 and 387 MW, that is 16–52 % of it. · 3
US UTILITY · MEASUREDAn oscillation the utility had no models for14.7 Hz from a data centre for months, one episode two hours long, caused by the UPS input stage. The utility had no models of the equipment. · 8
NORWAY · 2018 · MEASUREDA grid function must be specified, not inheritedUPS batteries gave fast frequency reserve, but in the real activation they reused an existing frequency setting and did not hold for the specified 30 s. · 9
02What the grid asks for
Figure 1. Statnett's proposed fault ride-through profile for consumption of 30 MW or more, or at 110 kV or more (consultation of April 2026), with one UPS maker's stated rectifier limit.Sources 5, 19
Norway, status as read 13 November 2026. On 9 November 2026 Statnett paused new section 14 applications from data centres while it writes functional requirements for them, and expects to lift the pause by 1 August 2027 at the latest. Its April 2026 consultation proposes riding through a dip to zero voltage for 150 ms, with consumption back within ±5 % no later than 1 s after the voltage is back above 90 %; Fingrid and EirGrid propose similar rules. Under NVF 2025 a battery counts as a power park, with requirements of its own. Today's limits on voltage steps, flicker and harmonics are in the quality-of-supply regulation. · 5, 6, 3, 7, 12, 13
03Why AI load is different, and where coordination breaks
Synchronous AI training makes a cluster's power swing by tens of megawatts, almost at once, every few seconds, for weeks; most of the energy of the swings lies between 0.2 and 3 Hz. At a strong connection a single step is small: in Tusen's screening of 64 combinations with representative parameters, one step reached a 3 % voltage change in only 2. The repetition is what matters. A swing every 5 seconds is 17,280 swings a day, where the regulation allows 12 steps of 3 % or more a day above 35 kV: flicker and oscillation limits, not the single step, are what need study. · 16, 17, 12
Figure 2. Time scales on a logarithmic axis: grid events, the operators' proposals, the AI load and measured or stated UPS behaviour. The shaded band is where a fast-recovery requirement meets a slow, staged UPS return.Tusen screening calculation; sources 1, 2, 3, 5, 6, 9, 16, 19, 20, 21Figure 3. Resonance screen with representative parameters: a plain capacitor bank's resonance falls within 10 % of the 5th, 7th, 11th or 13th harmonic in 11 of 20 cases (filled red). With a 7 % detuning reactor (small dots) the parallel resonance stays below the lowest harmonic in all of them.Tusen screening calculation; source 15
04How Tusen approaches it
Figure 4. Coordination layers. Each layer has a stated job and envelope; one coordination function holds every setting in one register and one EMT (electromagnetic-transient) model.Sources 1, 14, 16
Design basis on the operator's termsThe rules in force today, with the ride-through, recovery and ramp numbers under consultation as provisional targets, confirmed at the first operator meeting.
One function owns what the grid seesThe IT load smooths itself first, a buffer near the load takes the fast swings, the UPSs ride through and return staged, reactive equipment switches only inside set sequences.
No plain capacitor bank without a scanNo fixed bank on a bus feeding rectifiers without a frequency scan of every switching state, and first the question whether banks are needed at all.
Proven by study and site testNo widely accepted equipment-level test or certificate exists for large-load ride-through, so compliance is shown by a fixed package of studies and tests, each tied to a requirement. · 14, 18
Plain about where evidence endsBattery smoothing of AI load is shown so far only in the lab and in simulation. It is offered as a design option, proven by study for the site.
Ramp limiting needs energy
Turning a 100 MW step into a ramp takes 16.7 MWh and 20 min at 5 MW/min.
At 50 MW/min it takes 1.7 MWh and 2 min.
Cyclic smoothing needs power and cycle life
Flattening a 30 MW swing with a 5-second period takes 15 MW and about 10 kWh per half cycle.
That is 17,280 cycles a day, to check against the battery warranty.
Screening figures with representative parameters, not values for any site: the two duties are sized separately, and whatever else the battery is for (backup, peak limiting, market services) has to be named, because it sets the control priorities and the approvals.
05The studies and tests Tusen offers
Tusen leads the coordination, with the studies done by its engineer, a specialist in power system automation and protective relaying, and brings in specialist partners for EMT modelling and hardware-in-the-loop testing where needed.
Load flow and reactive capabilityThe reactive range and voltage control at the connection pointConcept
Harmonic study, frequency scan of every switching stateThe harmonic allocation for the connection; for direct customers, approved before signingBefore contract
Flicker and voltage-step assessmentPst, Plt and the daily step count in the quality-of-supply regulationConcept and detail
Ride-through and recovery in an EMT modelUPSs, storage, compensation, protection and their controllers, per phase, against the proposed profileDetail design
Battery as a power parkIts category and requirements, makers' validated models, and the emission of all converters togetherConcept and detail
Oscillation screen"Damp, do not amplify": the swing band and the converter interactionsDetail design
Protection and transfer logicNo disturbance-counting lockout without agreement, staged return, capacitor switching outside transfersDetail design
Controller hardware-in-the-loop testWhere justified, it moves control risk forward from the final field stageBefore site
Commissioning with the IT load presentSpecified and witnessed by Tusen, run by the installer: full load, no load, each control mode, ±10 % voltage change, a fault recorder at the connection, the model checked against the recordingsCommissioning
06Ready for your project
AI data centres
Ride-through, recovery and ramp rates on the operator's terms.
UPS, battery and compensation in one coordination order.
The application package for the plant and for the battery.
Factories and process plants
The same pattern of load loss has been measured at other large electronic loads, such as crypto-mining sites.
Harmonics, flicker, voltage steps and capacitor resonance, checked before equipment is bought.
Workshops, depots and battery parks
The quality-of-supply regulation sets the limits on voltage steps, flicker and harmonics at the connection point, and whoever's installation causes a breach must remedy it.
In Norway, a battery that can feed the grid is likely to need its own approval as a power park, to be confirmed with Statnett.
A first step: a short pre-study. Fixed scope, for your site: short-circuit data and source impedance from the network operator; a frequency scan of the candidate compensation; a voltage-step and flicker screen against your load profile; and a ride-through gap list for the UPS and compensation you are considering, against the operator's current proposal. It gives numbers for your own site and a list of questions for the operator.
NERC Load Modeling Working Group presentations, 27 January 2026 (UPS makers on ride-through). nerc.com
MISO. Interconnection Reliability Requirements for Large Load (draft). 2026-06-08. misoenergy.org
Power Systems & Controls. Series UPSC Guideform Specification. pscpower.com
Screening calculations marked as Tusen's use representative parameters and first-order formulas; they are reasons to study, not results for any site. The rules quoted are proposals or drafts where stated, and they change: check the operator's current text.
AI agents plan the work, draft code, calculations and documents in parallel, and test them before anyone reviews them. That is how one engineer delivers what used to take a team.
Every step leaves a record you can read
Tests and checks run before review, not after
Nothing leaves until a named engineer signs it
Method · SAD · open source
When code is cheap, review is the bottleneck.
A free method for building software with AI assistants. Every feature is explained three ways, for the domain expert, the architect and the engineer, and all three sign off.
Regulated work · safety certification · in development
Eleven agents gather. One engineer signs.
Tooling that assembles the evidence an IEC 61508 certification needs. Models propose, a deterministic checker scores, and a named engineer approves.
Tusen AS is not an accredited assessor, and the tooling does not certify anything.
Project work · design intake · in development
Stopped before it is sent.
For companies that run on projects: a gate that stops a purchase order, drawing or relay setting that contradicts its design basis, before it reaches a supplier.
Where Tusen works · ClusterAlpha
Rogaland first. Then the whole coast.
This map is drawn from ClusterAlpha, Tusen's own map of Norway's registered organisations and the infrastructure they run on: the power grid, rail, ferries, ports, and the fields and pipelines offshore. It is how Tusen finds the companies and projects that need engineering.
Coordination of a machine project, its mechanical, software and controls, electronics or electrical power design, a containerised unit, a power system or grid study, or a piece of software. Send a sketch, a problem or a specification, and the engineer who would do the work answers.